Power Shutdown Schedule in Chennai 2022
Check out the complete Chennai Power Shutdown Schedule 2022 for different areas below. We have listed the Chennai Power Shutdown Schedule 2022 datewise.
Power Shutdown Schedule in Chennai 2022 – 14th October
14-10-2022 | Madharpakkam | MADARAPAKKAM 33 KV | MADARAPAKKAM 33 KV | Madarpakkam, Arambakkam, Karadiputhur, Pallavada | To carry general maintenance | 14-10-2022 | 14-10-2022 |
Power Shutdown Schedule in Chennai 2022 – October
29-10-2022 | Gummidipoondi SIPCOT | GUMMIDIPOONDI SIPCOT SS -IV | GUMMIDIPOONDI SIPCOT SS -IV | Gummidipoondi Sipcot SS. IV Industrial Complex Area, Kayalarmedu, Elavoor, Pethikuppam Village, Sunnambukulam, obsamutharam, Chinaobalapuram, Periyaobalapuram, Thalayari palayam, Chinnanatham, Naras | To carry general maintenance | 29-10-2022 | 29-10-2022 |
28-10-2022 | Manali | MANALI 110 KVSS | MANALI 110 KVSS | CPCL Nagar, Kalaingar Nagar, Nedunchazhiyan salai, Edapalayam, Pillaipuram, Vimalapuram. | To carry general maintenance | 28-10-2022 | 28-10-2022 |
27-10-2022 | Thiruvellavoyal | THIRUVALLAVOYAL 33 KV | THIRUVALLAVOYAL 33 KV | Thiruvellavoyal, Kattur, Kalpakkam, Voyalur, Merattur, Neithvoyal, Kaniyambakkam, Vellambakam, Kadapakam, Chenghazhaneermedu, Oornambedu, Rmanathapuram | To carry general maintenance | 27-10-2022 | 27-10-2022 |
20-10-2022 | Ponneri | PONNERI 33 KV | PONNERI 33 KV | Anuppampattu, Thamdaperumbakkam, A.R Palavam Arasur | To carry general maintenance | 20-10-2022 | 20-10-2022 |
19-10-2022 | Irulipattu | IRULIPET 33 KV | IRULIPET 33 KV | Alinijivakkam, Athipattu, Irulipattu, Janapachatram, P.P.Road, Jaganathapuram Road, Saikiruba nagar, Virundhavan Nagar. | To carry general maintenance | 19-10-2022 | 19-10-2022 |
18-10-2022 | Royapuram | ANNA PARK 33 KV | ANNA PARK 33 KV | MC Road, Thoppai street, Adam street, Athan road,BC Press road, MS Kovil, Robinson park, pizzchandi lane, panaimara thotti, East madha street, west madha street, Marlyadoss street Meenatchiamma pettai | To carry general maintenance | 18-10-2022 | 18-10-2022 |
15-10-2022 | Gummidipoondi SIPCOT | GUMMIDIPOONDI SIPCOT SS – III | GUMMIDIPOONDI SIPCOT SS – III | Shirupuzhal Pettai, Pappankuppam, G.R.Kandigai, Billa kuppam, Suravari kandigai, Iyer Kandigai and Gummidipoondi Sipcot III Industrial complex area | To carry general maintenance | 15-10-2022 | 15-10-2022 |
13-10-2022 | Sembium | SEMBIUM 110/33-11 KV | SEMBIUM 110/33-11 KV | TH Road, Teachers colony, Muthumariamman koil street, Kaveri street, MH Road, Chinna kuzhandai street 1 to 4, Raja street, SSV koil street, Kamaraj salai, GNT Road part, Gandhi nagar street 1 to 4, Ja | To carry general maintenance | 13-10-2022 | 13-10-2022 |
12-10-2022 | Durainallur | DURAINALLUR 110 KV | DURAINALLUR 110 KV | Arani, Vadakkunallur, Sompattu, Puduvoyal, Peruvoyal, Karani, Mudalambedu, Kilikkod, kavarapettai, Chinnambedu, Durainallur, Arani, Kosavanpettai, palavakkam, Pondavakkam, Rallapadi, Karani, Mangalam. | To carry general maintenance | 12-10-2022 | 12-10-2022 |
07-10-2022 | Saidapet West | RR COLONY 33 KV SS | RR COLONY 33 KV SS | R.R.Colony, Saidapet West, Jafferkhanpet, Part of K.K.Nagar South , Part of Ashok Nagar | Annual Maintenance Work. | 07-10-2022 | 07-10-2022 |
07-10-2022 | Chennai | RR COLONY 33 KV SS | RR COLONY 33 KV SS | RR colony,sekar ngr,part of Ashok Nagar,west Jones road, kaveri Street,jothiammal nagar, chetty garden,gangai Amman koil Street,duraisamy thottam,VSM garden Street,B K.maistry street,Erikarai street | Annual maintenance work | 07-10-2022 | 07-10-2022 |
10-10-2022 | kadaperi | KADAPPERY 110 KV | SEMBAKKAM | Judge Colony all streets, Natrajan Street, Meenackshi Street, Balavinayagar Koil Street, Banu Avenue, Sanatorium Service, Road, Kamakotti Nagar, Chitlapakkam 2nd,3rd Main road, Sriram Coly | Maintenance | 10-10-2022 | 10-10-2022 |
Power Shutdown Schedule in Chennai 2022
Check out the complete Chennai Power Shutdown Schedule 2022 for different areas below. We have listed the Chennai Power Shutdown Schedule 2022 datewise.
30-09-2022 | ITC | EZHIL NAGAR 33/11 KV SS | EZHIL NAGAR | Ezhil nagar block No 31 | Execution of RMU Conversion works | 30-09-2022 | 30-09-2022 |
30-09-2022 | ITC | THORAIPAKKAM 33/11 KV | SAKTHI GARDEN | Sowdeshwari nagar | Execution of RMU Conversion works | 30-09-2022 | 30-09-2022 |
29-09-2022 | Kodungaiyur | KODUNGAIYUR 33 KV | KODUNGAIYUR 33 KV | Pumping station(HT service),west avenue,central avenue,kannadasan nagar,TH road,MR nagar, MKB nagar, 15,16,17,18,19,Central cross,13,14,15 East cross,4,7,8,TH main road,east avenue,krishnamoorthy naga | To carry general maintenance | 29-09-2022 | 29-09-2022 |
28-09-2022 | Manali | MANALI 33/11 KV SS | MANALI 33/11 KV SS | Sathyamoorthy Nagar,Kargil Nagar, Gangaiamman Nagar, Balakrishnan Nagar, Ramasamy Nagar, Rajaji Nagar, Kamarajar,Nagar, MGR Nagar, Periyar Nagar, Periyasekkadu, Ishwarya Nagar, Parvathi Nagar, Police | To carry general maintenance | 28-09-2022 | 28-09-2022 |
27-09-2022 | Sembium | SEMBIUM 110/33-11 KV | SEMBIUM 110/33-11 KV | TH Road, Teachers colony, Muthumariamman koil street, Kaveri street, MH Road, Chinna kuzhandai street 1 to 4, Raja street, SSV koil street, Kamaraj salai, GNT Road part, Gandhi nagar street 1 to 4, Ja | To carry general maintenance | 27-09-2022 | 27-09-2022 |
27 Sep 2022
27-09-2022 | Thiruverkadu, chennai | THIRUVERKADU 110/33-11 KV SUB STATION | Puranagar | Mehta hospital, sindhi college, PH road, Madhiravedu, Kaveri nagar, Co operative nagar, and above all surrounding areas | National highway work | 27-09-2022 | 27-09-2022 |
26 Sep 2022
26-09-2022 | Thiruverkadu, chennai | THIRUVERKADU 110/33-11 KV SUB STATION | Saveetha | Ishwarya garden, Royal garden, Jayalakshmi nagar, Aadhilakskmi nagar, ACS medical college, PH road, Co operative nagar, Mac nagar | National high way work | 26-09-2022 | 26-09-2022 |
25 Sep 2022
No Planned Shutdown Today
24 Sep 2022
24-09-2022 | Chennai | Saidapet 33/11KV SS | Saidapet 33/11KV SS | Thodhunter nagar,Arasu pannai,,neruppu medu,jothimanagar,East Jones Rd,dhideer Nagar,gotha medu,samiyarthottam,chetty st,bramin St,bazaar Rd,seshachalam St,Potter st,Balaji st,dhobikana,Alandur Rd ,,. | Annual maintenance work | 24-09-2022 | 24-09-2022 |
24-09-2022 | siruseri | SIRUSERI 110 KV SS | SIPCOT II | sipcot siruseri | Execution of RMU conversion work | 24-09-2022 | 24-09-2022 |
24-09-2022 | Chennai | SIRUSERI 110 KV SS | SIPCOT II | Sipcot situseri | OD to RMU conversion work | 24-09-2022 | 24-09-2022 |
23-09-2022 | TAMBARAM | RADHANAGAR | Nemilicheri | Srinivasalu Naidu Street, Nemilichery High Road,Postal Nagar, Periyar Nagar, DhanalakshmiStreet,AGS Colony, AK Nagar,Selvam Mahal. | MAINTEANCE WORK | 23-09-2022 | 23-09-2022 |
23-09-2022 | TAMBARAM | RAJAKEELPAKKAM 33/11 KV SS | VENUGOPALSAMY NAGAR | Maruthi nagar, Manavalan nagar, bakkiyam nagar, Thirumurthi nagar, Iyyapa nagar, Karpagam avenue, VGP pon nagar, Samraj nagar 8th street | MAINTENANCE WORK | 23-09-2022 | 23-09-2022 |
23-09-2022 | ITC | EZHIL NAGAR 33/11 KV SS | KANNAGI NAGAR | Kannagi nagar | Execution of RMU conversion work | 23-09-2022 | 23-09-2022 |
23-09-2022 | Chennai | EZHIL NAGAR 33/11 KV SS | KANNAGI NAGAR | Kannagi nagar | OD to RMU conversion work | 23-09-2022 | 23-09-2022 |
23 Sep 2022
23-09-2022 | Nanganallur | NANGANALLUR 33 KV | MOOVARASAMPET | NEHRU High road,mgr road | NEW RMU ERECTION WORK | 23-09-2022 | 23-09-2022 |
22 Sep 2022
No Planned Shutdown Today
21 Sep 2022
No Planned Shutdown Today
20 Sep 2022
No Planned Shutdown Today
19 Sep 2022
No Planned Shutdown Today
18 Sep 2022
No Planned Shutdown Today
17-09-2022 | kadaperi | KADAPPERY 110 KV | WEST TAMBARAM | GST Road,renganathapuramArea | Fault Tripping | 17-09-2022 | 17-09-2022 |
15-09-2022 | kadaperi | KADAPPERY 110 KV | 11KV Valluvar Gurukulam | GST Road,Tambaram Market Area | Fault Tripping | 15-09-2022 | 15-09-2022 |
14 Sep 2022
No Planned Shutdown Today
13 Sep 2022
No Planned Shutdown Today
12 Sep 2022
No Planned Shutdown Today
11 Sep 2022
No Planned Shutdown Today
10 Sep 2022
No Planned Shutdown Today
09 Sep 2022
No Planned Shutdown Today
08 Sep 2022
No Planned Shutdown Today
07 Sep 2022
No Planned Shutdown Today
06 Sep 2022
No Planned Shutdown Today
05 Sep 2022
No Planned Shutdown Today
04 Sep 2022
No Planned Shutdown Today
03 Sep 2022
No Planned Shutdown Today
02 Sep 2022
No Planned Shutdown Today
01 Sep 2022
No Planned Shutdown Today
31 Aug 2022
No Planned Shutdown Today
30 Aug 2022
No Planned Shutdown Today
29 Aug 2022
No Planned Shutdown Today
28 Aug 2022
No Planned Shutdown Today
27 Aug 2022
No Planned Shutdown Today
26 Aug 2022
No Planned Shutdown Today
25 Aug 2022
No Planned Shutdown Today
24 Aug 2022
No Planned Shutdown Today
23 Aug 2022
No Planned Shutdown Today
22 Aug 2022
No Planned Shutdown Today
21 Aug 2022
No Planned Shutdown Today
20 Aug 2022
No Planned Shutdown Today
19 Aug 2022
No Planned Shutdown Today
18 Aug 2022
No Planned Shutdown Today
17 Aug 2022
No Planned Shutdown Today
16 Aug 2022
No Planned Shutdown Today
15 Aug 2022
No Planned Shutdown Today
14 Aug 2022
No Planned Shutdown Today
13 Aug 2022
No Planned Shutdown Today
12 Aug 2022
No Planned Shutdown Today
11 Aug 2022
No Planned Shutdown Today
10 Aug 2022
No Planned Shutdown Today
09 Aug 2022
No Planned Shutdown Today
08 Aug 2022
No Planned Shutdown Today
07 Aug 2022
No Planned Shutdown Today
06 Aug 2022
No Planned Shutdown Today
05 Aug 2022
No Planned Shutdown Today
04 Aug 2022
No Planned Shutdown Today
03 Aug 2022
No Planned Shutdown Today
02 Aug 2022
No Planned Shutdown Today
01 Aug 2022
No Planned Shutdown Today
31 July 2022
No Planned Shutdown Today
30 July 2022
No Planned Shutdown Today
29 July 2022
No Planned Shutdown Today
28 July 2022
No Planned Shutdown Today
27 July 2022
No Planned Shutdown Today
26 July 2022
No Planned Shutdown Today
25 July 2022
No Planned Shutdown Today
24 July 2022
No Planned Shutdown Today
23 July 2022
No Planned Shutdown Today
22 July 2022
No Planned Shutdown Today
21 July 2022
No Planned Shutdown Today
20 July 2022
No Planned Shutdown Today
19 July 2022
No Planned Shutdown Today
18 July 2022
No Planned Shutdown Today
17 July 2022
No Planned Shutdown Today
16 July 2022
No Planned Shutdown Today
15 July 2022
No Planned Shutdown Today
14 July 2022
No Planned Shutdown Today
13 July 2022
No Planned Shutdown Today
12 July 2022
No Planned Shutdown Today
11 July 2022
No Planned Shutdown Today
10 July 2022
No Planned Shutdown Today
09 July 2022
No Planned Shutdown Today
08 July 2022
No Planned Shutdown Today
07 July 2022
No Planned Shutdown Today
06 July 2022
No Planned Shutdown Today
05 July 2022
No Planned Shutdown Today
04 July 2022
No Planned Shutdown Today
03 July 2022
No Planned Shutdown Today
02 July 2022
No Planned Shutdown Today
01 July 2022
No Planned Shutdown Today
30 June 2022
No Planned Shutdown Today
29 June 2022
No Planned Shutdown Today
28 June 2022
No Planned Shutdown Today
27 June 2022
No Planned Shutdown Today
26 June 2022
No Planned Shutdown Today
25 June 2022
No Planned Shutdown Today
24 June 2022
No Planned Shutdown Today
23 June 2022
No Planned Shutdown Today
22 June 2022
No Planned Shutdown Today
21 June 2022
No Planned Shutdown Today
20 June 2022
No Planned Shutdown Today
19 June 2022
No Planned Shutdown Today
18 June 2022
No Planned Shutdown Today
17 June 2022
No Planned Shutdown Today
16 June 2022
No Planned Shutdown Today
15 June 2022
No Planned Shutdown Today
14 June 2022
No Planned Shutdown Today
13 June 2022
No Planned Shutdown Today
12 June 2022
No Planned Shutdown Today
11 June 2022
No Planned Shutdown Today
10 June 2022
No Planned Shutdown Today
09 June 2022
No Planned Shutdown Today
08 June 2022
No Planned Shutdown Today
07 June 2022
No Planned Shutdown Today
06 June 2022
No Planned Shutdown Today
05 June 2022
No Planned Shutdown Today
04 June 2022
No Planned Shutdown Today
03 June 2022
No Planned Shutdown Today
02 June 2022
No Planned Shutdown Today
01 June 2022
No Planned Shutdown Today
31 May 2022
No Planned Shutdown Today
30 May 2022
No Planned Shutdown Today
29 May 2022
No Planned Shutdown Today
28 May 2022
No Planned Shutdown Today
27 May 2022
No Planned Shutdown Today
26 May 2022
No Planned Shutdown Today
25 May 2022
No Planned Shutdown Today
24 May 2022
No Planned Shutdown Today
23 May 2022
No Planned Shutdown Today
22 May 2022
No Planned Shutdown Today
21 May 2022
No Planned Shutdown Today
20 May 2022
No Planned Shutdown Today
19 May 2022
No Planned Shutdown Today
18 May 2022
No Planned Shutdown Today
17 May 2022
No Planned Shutdown Today
16 May 2022
No Planned Shutdown Today
15 May 2022
No Planned Shutdown Today
14 May 2022
No Planned Shutdown Today
13 May 2022
No Planned Shutdown Today
12 May 2022
No Planned Shutdown Today
11 May 2022
No Planned Shutdown Today
10 May 2022
No Planned Shutdown Today
09 May 2022
No Planned Shutdown Today
08 May 2022
No Planned Shutdown Today
07 May 2022
No Planned Shutdown Today
06 May 2022
No Planned Shutdown Today
05 May 2022
No Planned Shutdown Today
04 May 2022
No Planned Shutdown Today
03 May 2022
No Planned Shutdown Today
02 May 2022
No Planned Shutdown Today
01 May 2022
No Planned Shutdown Today
30th April 2022
No Planned Shutdown Today
29th April 2022
No Planned Shutdown Today
28th April 2022
No Planned Shutdown Today
27th April 2022
No Planned Shutdown Today
26th April 2022
No Planned Shutdown Today
25th April 2022
No Planned Shutdown Today
24th April 2022
No Planned Shutdown Today
23rd April 2022
No Planned Shutdown Today
22nd April 2022
No Planned Shutdown Today
21st April 2022
No Planned Shutdown Today
20th April 2022
No Planned Shutdown Today
19th April 2022
No Planned Shutdown Today
18th April 2022
No Planned Shutdown Today
17th April 2022
No Planned Shutdown Today
16th April 2022
No Planned Shutdown Today
15th April 2022
No Planned Shutdown Today
14th April 2022
No Planned Shutdown Today
13th April 2022
No Planned Shutdown Today
12th April 2022
No Planned Shutdown Today
11th April 2022
No Planned Shutdown Today
10th April 2022
No Planned Shutdown Today
09th April 2022
No Planned Shutdown Today
08th April 2022
No Planned Shutdown Today
07th April 2022
No Planned Shutdown Today
06th April 2022
No Planned Shutdown Today
05th April 2022
No Planned Shutdown Today
04th April 2022
04-04-2022 | Kandanchavadi | THARAMANI 33/11 KV | RAJIV NAGAR | Old Kamaraj Nagar Main road, Old Kamaraj Nagar 1st,2nd,3rd and 4th street,Rams Appartment, Perungudi | RMU conversion DP to 2RL | 04-04-2022 | 04-04-2022 |
03rd April 2022
No Planned Shutdown Today
02nd April 2022
No Planned Shutdown Today
01st April 2022
No Planned Shutdown Today
31st March 2022
No Planned Shutdown Today
30th March 2022
No Planned Shutdown Today
29th March 2022
No Planned Shutdown Today
28th March 2022
No Planned Shutdown Today
27th March 2022
No Planned Shutdown Today
26th March 2022
No Planned Shutdown Today
25th March 2022
No Planned Shutdown Today
24th March 2022
No Planned Shutdown Today
23rd March 2022
No Planned Shutdown Today
22nd March 2022
No Planned Shutdown Today
21st March 2022
No Planned Shutdown Today
20th March 2022
No Planned Shutdown Today
19th March 2022
No Planned Shutdown Today
18th March 2022
No Planned Shutdown Today
17th March 2022
No Planned Shutdown Today
16th March 2022
16-03-2022 | Guindy | GUINDY INDL ESTATE 110 KV | GUINDY INDL ESTATE 110 KV | Industrial Estate Guindy,Ambal Nagar,Pillaiyar Koil 3rd,5th & 6th street, A,B,C & D Block,Poomagal street,South phase,Mount Road Partial,J.N.Salai,Pallavan Street,Kabilar street,V.O.C.Street | Maintenance work | 16-03-2022 | 16-03-2022 |
15th March 2022
No Planned Shutdown Today
14th March 2022
No Planned Shutdown Today
13th March 2022
No Planned Shutdown Today
12th March 2022
No Planned Shutdown Today
11th March 2022
No Planned Shutdown Today
10th March 2022
No Planned Shutdown Today
09th March 2022
09-03-2022 | Chemenchery | DLF | DLF | TNSCB, Karanai,DLF apartment,Ezhil nagar | Annual Maintenance | 09-03-2022 | 09-03-2022 |
08th March 2022
08-03-2022 | Porur | KOVOOR 33/11 KV | KOVOOR 33/11 KV | 1.Kovoor 2.Periyapanicheri 3.Chikkarayapuram 4.Thandalam 5.Manancheri 6.Babu Garden 7.Akash Nagar 8.Manikandan Nagar 9.Metha Nagar 10.Part of Kundrathur. | Maintenance work | 08-03-2022 | 08-03-2022 |
07th March 2022
CHENNAI SOUTH II
07-03-2022 | Kandanchavadi | THARAMANI 33/11 KV | THARAMANI 33/11 KV | M.G.R Salai,Godandaram street,Sandiyappan salai,Govindasamy Nagar 3rd & 4th street,Annanedunchalai,P.T Kamaraj Nagar,Dr.A.P Nagar entire Kallukuttai area,CBI Colony,Kamaraj St,Kurinji Nagar area | Maintenance Work | 07-03-2022 | 07-03-2022 |
06th March 2022
No Planned Shutdown Today
05th March 2022
No Planned Shutdown Today
04th March 2022
No Planned Shutdown Today
03rd March 2022
No Planned Shutdown Today
02nd March 2022
No Planned Shutdown Today
01st March 2022
No Planned Shutdown Today
Disclaimer: The above information is for general informational purposes only. All information on the Site is provided in good faith, however we make no representation or warranty of any kind, express or implied, regarding the accuracy, adequacy, validity, reliability, availability or completeness of any information on the Site.